Case Study: D Morgan, Bishopton, Scotland
✔ Summer 2012
✔ Value: £150k
Scheme
Redevelopment of redundant BAE munitions site
Scope of works
We undertook drainage works to an existing large BAE ‘brown field’ site that was previously a large munitions factory.
We laid approx 1000 metres of 1200mm diameter and 1000 metres of 1050mm pipes as well as construction of RC outfall head walls and flow control chambers (orifice plates and penstocks)
All works are undertaken in an efficient, professional and most importantly a safe manner.